Backup Power For Solar Homes: EPS And UK Compliance Explained
Why Backup Power Matters In Coastal Suffolk
Power cuts on the Suffolk coast are not uncommon. Storms, salt air and long overhead lines raise the risk. As more homes pair solar with batteries, keeping essentials live during an outage is sensible.
“Critical circuits” typically include:
- Selected hallway and kitchen lighting
- Wi‑Fi/router and ONT
- Fridge‑freezer
- Home office sockets
- Heating and hot water controls, circulation pumps
- MVHR/ventilation
EPS (Emergency Power Supply) keeps these circuits running safely when the grid fails, without backfeeding the network. Clima Tech’s accredited engineers design neat, compliant systems for coastal homes. See regional options at solar panels in Suffolk and plan your wider electrics at plan electrics EV solar heat pump Suffolk.
EPS, Backup Inverters And ATS: How They Work Together
EPS powers only your critical circuits. Whole‑home backup aims to run most or all loads and needs larger batteries, more switching gear and careful load management. For UK homes, EPS is simpler, faster to install and usually the most cost‑effective route to resilience.
Modern hybrid inverters with batteries often include a dedicated backup output feeding a separate “critical circuits” consumer unit. An Automatic Transfer Switch (ATS) or interlocked manual changeover provides break‑before‑make transfer. ATS typically switches within 10–30 ms—fast enough for LED lighting and IT. High‑draw loads such as ovens, EV chargers and immersion heaters are excluded to preserve runtime and avoid overload.
UK Compliance: G98/G99, BS 7671 And DNO Approvals
Smaller domestic systems usually fall under ENA G98 (install and notify), while larger, three‑phase or higher‑export systems require G99 (apply for prior approval). In Suffolk, UK Power Networks handles notification or approval.
Anti‑islanding is mandatory: equipment must disconnect cleanly when the grid drops, and changeover must be open‑transition to prevent any backfeed to the network.
BS 7671 requires correct protective devices (RCD/RCBOs, AFDDs where specified), SPD selection, suitable fault protection, and clear labelling of backup circuits and isolation points. Clima Tech designs, installs and commissions to current standards. For more detail see Suffolk solar batteries G98/G99 UKPN approvals and our accreditations.

This image was generated with AI and may not always represent the product or service exactly.
Designing Your Critical Circuits Board For Reliability
Include only what you truly need on backup to maximise runtime:
- Essential lighting (hall, kitchen, stairs)
- Router/ONT and key sockets for IT
- Fridge‑freezer
- Heating/hot water controls and circulation pumps
- MVHR or extract ventilation if required
Leave high‑draw loads (ovens, kettles, EV chargers, immersion heaters) on the main board.
We profile your typical winter loads to right‑size the battery and avoid nuisance trips. The EPS board uses clearly labelled MCBs and RCD/RCBOs, AFDDs where specified, accessible test points and documented isolation. For help with compliant boards and maintenance, see electrical installation services.
Automatic Vs Manual Transfer: Choosing The Right Switchgear
- ATS: Fast and hands‑off; ideal where a brief flicker is acceptable but downtime is not (lighting, routers, PCs).
- Manual interlocked changeover: Lower cost and very robust; suits homes with rare outages and tolerant loads.
Both options must be interlocked and break‑before‑make to prevent any parallel connection with the grid. Adopt a simple routine: quarterly simulated outage, visual checks for damage or corrosion, and a logbook entry. Clima Tech provides user training and maintenance so you stay confident in operation.
Earthing, Neutral Bonding And Generator/EV Integration
Many UK homes have TN‑C‑S (PME) supplies. In island mode, the backup system often needs its own neutral‑earth bond for RCDs to operate correctly. Some designs require switching the neutral to keep the island safely separated from the grid earthing system.
Planning a portable generator or future vehicle‑to‑home (V2H)? Design the interface now so earthing, bonding and changeover remain compliant. Larger properties may consider three‑phase arrangements for balanced loads and future growth. Always use professional design and verification before integrating new sources.
Coastal Installs: Corrosion, Location And Surge Protection
Salt air accelerates corrosion. We specify marine‑grade or powder‑coated enclosures, stainless fixings, IP‑rated glands and correct standoffs away from cold, damp walls. Locate batteries and inverters in cool, ventilated utility spaces, with tidy cable routes and attention to acoustic performance.
Coastal storms and overhead lines increase surge risks. We advise coordinated SPDs: Type 1 where required, Type 2 on AC boards, and DC surge protection for PV strings. Read more in electrical protection for renewables SPD AFDD load management.

This image was generated with AI and may not always represent the product or service exactly.
Battery Sizing And Realistic Backup Runtimes
Estimate your core loads:
- Lights: 50–150 W total
- Router/ONT: 10–20 W
- Fridge‑freezer (average): 50–120 W
- Heating controls and pumps: 50–150 W
- IT (laptop/monitor): 50–200 W
As a guide, a 10 kWh battery could support 300–400 W of core loads for 20–30 hours, assuming modest cycling and no high‑draw appliances. A 5 kWh battery may cover an evening and night. During daylight, PV can recharge the battery if your inverter supports islanded operation. Pause immersion diverters and other discretionary loads during outages to prioritise essentials.
Quick check: runtime (hours) ≈ usable battery (kWh) ÷ average load (kW).
Your Installation Journey With Clima Tech
- Survey and load assessment
- Design of EPS board, changeover strategy and battery/inverter layout
- DNO notification or approval with UK Power Networks
- Clear design pack and programme issued before works
On install day we follow strict safe isolation, lock‑off and verification steps. We commission to BS 7671, test, label and hand over with training and an app walkthrough. Ongoing support covers monitoring, firmware updates and performance checks. Ready to start? Send us details via our estimation form.
Costs, Grants And Long‑Term Value
Budgets vary with:
- Battery capacity and inverter choice
- ATS or manual changeover hardware
- Consumer unit upgrades and protective devices (SPD/AFDDs)
- Coastal hardening and installation conditions
EPS is often the best‑value route to resilience. It protects food, keeps you working and supports smart self‑consumption all year. Finance options are available, and wider electrification plans can benefit from grants such as the Boiler Upgrade Scheme for heat pumps. We’ll map the lifetime value: reduced disruption, safer storage of perishables and stronger energy independence.
FAQs And Next Steps
During an outage, the battery can recharge from PV if there’s daylight and your inverter supports islanded PV operation. Expect a brief flicker on ATS switchover; manual changeovers take longer and need user action. We recommend a quick quarterly test and an annual visual check, with professional servicing as needed.
For a compliant, tidy and local install, contact Clima Tech to arrange a survey or use our estimation form.
FAQs
What loads can I realistically run on EPS?
Most homes keep lights, Wi‑Fi, fridge‑freezer, heating controls, pumps and a few IT sockets live. High‑draw appliances stay on the main board to preserve battery runtime.
Will my existing inverter provide backup power?
Only if it has a dedicated EPS/backup output and suitable firmware. If not, we can specify a compatible hybrid inverter and battery to add backup safely.
How quickly does an ATS switch to backup?
Typically 10–30 ms. You may notice a brief flicker, but routers, laptops and LED lighting usually ride through without resetting.
Can I charge the battery from solar during a power cut?
Yes—if the system supports islanded operation. The inverter forms a local grid so PV can recharge the battery when there’s usable sunlight.
Do I need neutral switching or extra earthing for EPS?
Often on TN‑C‑S supplies. Correct neutral‑earth bonding and, in some cases, switched neutral are essential for safe disconnection and RCD operation.
How often should I test my EPS system?
Run a quarterly simulated outage with a quick visual check. Keep a logbook and book periodic professional inspection for peace of mind.
Can a heat pump run during backup?
Controls and pumps can. Running the compressor depends on battery capacity and inverter rating. We assess this at design stage to avoid overloads.